- Home
- Departments
- Engineering
- Master Plans
Master Plans
The City of Bluffdale creates and maintains Master Plans as a way to ensure that growth is managed in a well-organized manner. By planning efficiently for the future, the City can prioritize urgent needs while ensuring that our infrastructure will be able to accommodate new and anticipated future development.
- Bluffdale General Plan (PDF)
- Bluffdale Transportation Plan (PDF)
- Bluffdale Water Master Plan II - Pressurized Irrigation (PDF)
- Bluffdale 2019 Drinking Water Master Plan (PDF)
- Floodplain Management Plan 2018 (PDF)
- 2019 Storm Water Master Plan Update (PDF)
- Bluffdale Stormwater Management Plan (PDF)
- Bluffdale Impact Fee Facility Plan and Analysis March 2024 (PDF)
To provide feedback on the Stormwater Management Plan, please contact Addison Mitton or call 801-254-2200 x 427.
-
Engineering
Physical Address
2222 West 14400 South
Bluffdale, UT 84065
Fax: 801-446-5662
-
Michael Fazio
City EngineerPhone: 801-254-2200 Ext. 430
-
Dan Tracer
Assistant City Engineer / Water SystemsPhone: 801-254-2200 Ext. 432
-
Addison Mitton
Assistant City Engineer / StormwaterPhone: 801-254-2200 Ext. 427
-
Fabricio Parra
Staff EngineerPhone: 801-254-2200 Ext. 436
-
Tom Hyatt
Engineering Construction ManagerPhone: 801-254-2200 Ext. 435
-
Josh Smith
Engineering Construction InspectorPhone: 801-254-2200 Ext. 433
-
Kevin Thompson
Engineering DesignerPhone: 801-254-2200 Ext. 436
-
Marcia Adler
Engineering AdministratorPhone: 801-254-2200 Ext. 431
-
John Lambert
Encroachment Officer / Drainage InspectorPhone: 801-254-2200 Ext. 413
-
14600 S Railroad Crossing Project
Phone: 24-hour Project Hotline: 385-247-0775